Free Earthwork Planning Tool

Check the Quantity. Size the Haul. Plan the Production.

Use the calculator to estimate topsoil strip volume, truckloads, recommended truck count, daily production, haul duration, and optional trucking cost.

Use the Calculator

Free Earthwork Estimating Tool

Topsoil Strip & Haul Calculator

Estimate bank and loose volume, truckloads, daily production, haul duration, and optional trucking cost.

Quantity Input

Enter the site area.
Use CY when volume is already known.
Typical starting assumption: 6 inches.
Verify against material conditions.
Available with direct CY input.

Truck & Haul Setup

Working days used to recommend a truck count.
Optional. Leave blank for the recommended count.
Loose CY per load.
Optional dollars per load.
Optional daily cost per truck.

Quantities

Method—
Area—
Depth—
Bank CY—
Loose CY—
CY per Acre—

Production

Recommended Trucks—
Truck Setup Used—
Total Loads—
Loads per Truck—
Total Loads / Day—
CY / Day—
Haul Duration—

Optional Cost

By Load—
By Truck Day—
Per Bank CY—

Estimator Summary

Enter the project inputs and calculate to generate a concise planning summary.

Need a complete earthwork takeoff or estimating support?

Email the plans, location, bid deadline, and requested scope for review.

Email a Project for Review

Planning aid only. Recommended truck count is a mathematical ballpark based on loose volume, stated truck capacity, loads per truck per day, and target duration. It does not account for haul distance, loading and dump queues, traffic, site access, breakdowns, weather, legal payload limits, or field constraints. Verify all results against actual project conditions. Formula for area inputs: area × depth ÷ 27 = bank cubic yards.